Tappan Zee BRT Cost Estimates: Out of Step With Industry Standards
Five billion dollars, give or take. That is the alleged cost of putting bus rapid transit (BRT) along a 30-mile stretch of the I-287 corridor,
Five billion dollars, give or take. That is the alleged cost of putting bus rapid transit (BRT) along a 30-mile stretch of the I-287 corridor,